Installation manual
Simrad SH80
50
851--164300 / C
6.4 Sonar Operating Panel
Observe the following procedure. To ensure correct operation, tick
off every item when the action has been carried out.
1 Mount the Sonar Operating Panel in an almost horizontal
position to facilitate operation of the trackball.
- The necessary mounting hardware (four screws, four nut
plates and four bolt covers) are supplied in the standard
delivery.
2 Drill and cut the panel opening as shown in the figure.
3 Mount the Sonar Operating Panel using the supplied
hardware.
a Position the four nut plates shown in the figure.
b Use a 3 mm Allen key to fasten the four special bolts.
c Mount the bolt covers in the four corners of the Operating
Panel.
372 mm
Nut plate
152 mm
4
0
1
.
9
m
m
ø7x4
(CD5654)
Figure 15
Operating panel
cut-out
Related topics
→ Maximum cable distances, page 47.