Installation manual

Simrad SH80
28
851--164300 / C
Figure 3 SH80 sonar room arrangement - example
Lighting
Hatch
Minimum load
capacity: 2 tonnes
Bulkhead
steps
Transceiver Unit
Motor Control Unit
(*) = recommended height for
good working conditions
Heater
Min. 3000
(+ lifting device)
Min. 4000
Air vent pipes
(Minimum diameter
50 mm)
25
1200 (*)
Min. 920
Pipes
(Diameter 10 mm)
(CD5896A)