Installation manual
Start-up procedures
97
851-164300 / C
9.6 Checking the Operating Panel
Introduction
The simulated echoes makes it possible to test out most of the
operational functions without starting up the Transceiver Unit.
→ The layout of the Operating Panel is shown in figure 35
Figure 35 The Operating Panel
POWER
Up
Middle
Down
MAIN SW.
SYMBOL
Gain
H -
Range
H -
Gain
V -
Range
V -
Gain
H +
Range
H +
Gain
V +
Range
V +
MODE
Mode
1
GAIN
Mode
2
Mode
3
Mode
4
RANGE CURSOR
SelectMenu
View
Object
SONAR OPERATING PANEL
TILT
Manual
Auto
VARIOUS
Zoom
Record
Off
Centre
Position
Track
Manual
Target
Track
Auto
Search
TRAIN
(CD5377A / WMF / GIF)
SIMRAD
1
2 3
4
5
8
9
6
7
Functional test
Observe the following procedure to check a selection of the
operational functions.
Markers
1 Check the Target Marker.
a Use the trackball on the Operating Panel, and move the
cursor to the echo area.
b Press the Target Marker button (fi eld 2, top button).
c Check that a numbered triangle appears in the position of
the cursor.
2 Check the Ship Marker.
a Press the Ship Marker button (f ield 2, second button).
b Check if a square symbol appears at the ship’s symbol.