Installation manual
Simrad SD570 / Base version
12
851--160116 / B
3.5 Installation checklist
For the following check list, refer to the sonar room requirements
in chapter 1.3.
INSTALLATION CHECKLIST YES NO
Are the access hatches satisfactory?
Is the heating satisfactory?
Is the insulation satisfactory?
Is the ventilation satisfactory?
Are the access hatches satisfactory?
Is a bilge pump installed?
Is the lighting satisfactory?
Is the sonar room suitably floored?
If the answer to any of the questions is NO, make a note in the
installation certificate at the end of section Start-up procedures.