3 GENERAL REQUIREMENTS
3.1 Responsibility and approbation
The Hull Unit of the sonar is generally approved by The
Norwegian Veritas (Organization for classification and registry of
shipping). An approval of the installation must, however, be
applied for in each case to the local maritime authority.
The ship owner and the shipyard are responsible for the
application.
3.2 Compass deviation
When the installation is finished, the compass must be checked
both with the sonar operative and inoperative. The ship owner
and the skipper are responsible for such a check to be carried out.
3.3 Noise sources
Prior to installation, the vessel’s hull should be thoroughly
inspected in dock. Roughness on the s hell plating surface, and
protruding obstacles are examples of noise-causing elements.
These must be smoothed or removed. Also ensure that the
propeller is not chipped or corroded.
3.4 Docking
When dry docking the vessel, make sure that there is enough
room underneath for installation of the sonar trunk and
protection blister (refer to figures 4 and 5 in section Installation
procedures .
3.5 Cabling
If the cable from the wheelhouse to the sonar room passes through
hatches or places where it may be damaged, it should be run
through a pipe. Note that the cable must not be installed together
with high-power cables, antenna cables etc.