Installation manual
Purse seine hydrophone installation
57
851-165187 / Rev.A
Dual hydrophone installation
Large vessels and operations requiri ng a greater than normal
coverage area can install two hydrophones with a vertical and
horizontal overlap. Hydrophone selection is made with the help
of a switch located in the wheelhouse.
To r educe the possibility of interference from air bubbles and
underwater noise when reversing propulsion or using thrusters
the two hydrophones should be located at least five meters from
each other in the fore and aft plane. It is also recommended to
install the two hydrophones with a slightly different tilt angles
so that a larger vertical sector may be covered. Vessels equipped
with a bowthruster or bulbous bow can install the first
hydrophone forward of the bowthruster on the bulbous bow and
the second aft of the bowthruster. Dual hydrophone installations
may be either keel mounted or installed in free-standing blisters.
Horizontal coverage areas
When the seine is normally located forward of the starboard
beam when pursing the following information should be taken
into consideration:
• When the seine is pursed in the sector from approximately
000_ to about 130_ relative to t he bow, the foremost
hydrophone should be installed at an angle of 50_ and the
after 90_ to the vessel’s centre line.
• Should special circumstances require coverage outside the
standard 000_ to 130_ sector the hydrophones may be
installed accordingly.
(A) = Aft hydrophone, (B) = Forward hydrophone
(C) and (D) = Horizontal coverage areas