Installation manual

Operator unit installation
129
851-165187 / Rev.A
Bulkhead
Secure the mounting bracket to the
upper or lower mounting holes. I f you
use the lower position you will be
able to tilt the cabinet forward. If you
wish to tilt the cabinet upwards, you
need to use the upper mounting
position.
Panel mount
The PI54 Operator Unit can also be flush mounted in a panel or
console. You will then need to make a rectangular hole with
four holes for 4 mm mounting bolts.
Use a screwdriver to carefully remove the four corner covers on
the cabinet. R eplace the covers when then bolts are in place.
Observe that you will need an 11 cm minimum clearance behind
the cabinet for the cables.