Installation manual
Introduction
5
851-165187 / Rev.A
Supply conditions
The following supply conditions ar e applicable to standard
Simrad PI54 deliveries and associated optional equipment.
Equipment responsibility
The shipyard performing the installation and/or dealer becomes
fully responsible for the equipment upon receipt unless
otherwise stated in the contract. The duration of responsibility
includes:
• The period of time the equipment is stored locally before
installation.
• During the entire installation process.
• While commissioning the equipment.
• The period of time between commissioning and the final
acceptance of the equipment by the end user (normally the
owner of the vessel which the equipment has been installed).
The Simrad PI54 system guarantee period (as specified in the
contract) begins when the acceptance documents have been
signed unless other arrangements have been made in the
contract.
Receipt, unpacking and storage
Upon accepting shipment of the equipment, the shipyard and/or
the dealer should ensure that the delivery is complete and
inspect each shipping container for evidence of physical
damage. If this inspection reveals any indication of crushing,
dropping, immersion in water or any other form of damage, the
recipient should request that a representative from the company
used to transport the equipment be present during unpacking.
All equipment should be inspected for physical damage, i.e.
broken controls and indicators, dents, scratches etc. during
unpacking. If any damage to the equipment is discovered, the
recipient should notify both the transportation company and
Simrad so that Simrad can arrange for replacement or repair of
the damaged equipment.
Once unpacked, the equipment must be stored in a controlled
environment with an atmosphere free of corrosive agents,
excessive humidity or temperature extremes. The equipment
must be covered to protect it fro m dust and other forms of
contamination when stored.