Installation manual

10 |
Hardware mounting |10kW and 25kW Installation Manual
Install the scanner
Ensure all points in “Choose the scanner location on page 4 have been considered.
Fitting the antenna to the pedestal
Remove the protective caps from the antenna and pedestal, shortly before  tting.
When placing antenna on to pedestal, ensure correct orientation is used - both the antenna
and the platform on the pedestal have a front and back edge, even though they may appear
nearly symetrical.
1 10 kW pedestal rotating platform
2 25 kW pedestal rotating platform
3 front edge of platform (antenna front should be on same side)
Tighten the supplied M10 hex bolts to 350 kg-cm (34.3 N·m or 25.3 lb·ft)
1 antenna (front shown)
2 rotating platform (pedestal top)
3 brass isolating washer
4 spring washer
5 hex bolt (M10 x 35mm)
6 protective caps