Installation manual

Simrad ES60
General supply conditions
The following supply conditions are a pplicable to this Simrad
ES60 Fish nding echo sounder delivery.
Equipment responsibility
The shipyard performing the installation and/or equipment dealer
becomes fully responsible for the equipment upon receipt unless
otherwise stated in the contract. The duration of responsibility
includes:
The period of time the equipment is stored locally before
installation.
During the entire installation process.
While commissioning the equipment.
The period of time between commissioning and t he nal
acceptance of the equipment by the end user (normally the
owner of the vessel which the equipment has been installed).
Unless other arrangements have been made in the contract, the
ES60 Fish nding echo sounder system guarantee period (as
specied in the c ontract) begins when the acceptance documents
have been signed
Receipt, unpacking and storage
Upon accepting shipment of the equipment, the shipyard and/or
the dealer should ensure t hat the delivery is complete and inspect
each s hipping container for evidence of physical damage. If
this inspection reveals any indication of crushing, dropping,
immersion in water or any other form of damage, the recipient
should request that a representative from the company used to
transport the equipment be present during unpacking.
All equipment should be inspected for physical damage, i.e.
broken controls and indicators, dents, scratches etc. during
unpacking. If any damage to the equipment is discovered,
the recipient should notify both the transportation company
andSimrad so that Simrad can arrange for replacement or repair
of the damaged equipment.
Once unpacked, the equipment must be stored in a controlled
environment with an atmosphere free of corrosive agents,
excessive humidity or temperature extremes. The equipment
must be covered to protect it from dust and other forms of
contamination when stored.
For more information, refer to Equipment handling on page 15