User guide
FS 20/25 Operators Manual 901-10037001/1.1
FS 20/25 Installation, System Set-Up and Test Page 4.3
Kongsberg Simrad Mesotech Ltd.
Port Coquitlam, BC - Canada
4. FS 20/25 INSTALLATION, SYSTEM SET-UP AND
TEST
4.1 INSTALLATION PROCEDURE
The installation of the FS 20/25 Trawl Monitoring System involves the following steps:
• Deciding on the locations in the wheel house for the surface units.
• Mounting the surface units and making the connections between the FS 20/25
HP PC Processor, the display unit, the FS 20/25 Power Supply/TTM interface
unit, and other optional equipment being installed.
• Assembling the trawl unit.
• Running up the system on the test cable to verify proper installation, configure
control unit, and perform initial system test.
• Installing the cable winch, snatch block and trawl cable, and connecting the
winch slip-rings to the control unit.
• Mounting the trawl unit to the headrope and completing the final system test.
• Mounting the catch sensors to the cod-end of the trawl.
4.2 SURFACE UNIT ELECTRONICS INSTALLATION
4.2.1 Mounting of Units
The display unit should be located in the wheel house in a place that provides a good
view of the screen and avoids direct sunlight, if possible. Depending on the monitor
that was selected, the unit may be mounted on top or recessed into the bridge
console. Simrad supplied display units include the necessary mounting brackets.
The FS 20/25 HP PC processor should be mounted in close vicinity to the operator's
position in the wheel house and near the display unit. The unit may be mounted below
or recessed into a cabinet. Note: You must have access to the ON/OFF switch.
The Power Supply/TTM interface module supplied with the system may be mounted
on top of the bridge console or recessed and flush mounted into the bridge console.
Sufficient space should be left around the control unit for proper ventilation.










