Installation manual
60 |
Installation checklist | AP70/AP80 Installation manual
Installation checklist
General
When all units are installed, external equipment connected and the software confi gured
according to the previous sections, the installation should be verifi ed according to the check
lists in the following pages.
Checklist
Description Refer Yes/No N/A
Units mounted and secured according to instructions page 18
CAN bus powered and terminated according to instructions page 20
Correct power and polarity to computer and control units page 21
Sources selected page 38
SimNet groups defi ned page 40
Master station defi ned page 41
Drive units confi gured and calibrated page 42
Vessel confi gured page 46
Compass calibrated page 48
Seatrial completed (manual or autotune) page 50
Connected equipment approved according to notifi ed body
User training provided
Date:
Signature Installer Signature Captain
6










