Installation Guide
4
ASSEMBLY INSTRUCTIONS
1
D
C
D
AA
CC
DD
2
AA
CC
3
2. Line up the holes in the Rotating Hub (C) on top of
the Metal Stand (D). Secure the Rotating Hub (C) to
the Metal Stand (D) with 4pcs Bolts (CC) and 4pcs
Washers (DD). Tighten with the Large Wrench (AA).
Hardware Used
Large Wrench
Bolt
x 1
x 4
DD
Washer
x 4
FF
Base Plug
x 4
E
FF
sand
water
1. Assemble the Metal Stand (D) by overlapping the
metal bars together on the ground in a cross pattern as
shown.
3. Remove each Base Plug (FF) by turning counter-
clockwise . Fill each section of Base (E) with up to
55-lbs of sand (not included), 220-lbs for all four,
pouring water into the base intermittently to help pack
the sand. Screw the Base Plug (FF) clockwise
back into place.
Ensure that the rubber gasket is present on the Base
Plug (FF) to prevent the Base (E) from leaking. When
filling, leave a small void in the base to allow room for
the water to expand when it freezes in the winter.
open
close








