Installation Manual: 22.8kWh
SimpliPhi Power, Inc. | 3100 Camino Del Sol | Oxnard, CA 93030, USA | (805) 640-6700 | info@simpliphipower.com | SimpliPhiPower.com
| 46 |
5.3 – Configuring the Sol-Ark to a Specific Application
The Sol-Ark is capable of many different modes of operation via configurable settings (more than one mode can
be used simultaneously). This section of the Manual will outline the system programming and setup basics for
common use cases. However, refer also to the Sol-Ark Manual for all installation requirements relevant to the
application at hand.
Table 4.0 –AccESS Sol-Ark System Grid Settings
System Setup > Grid Setup
80% DoD
(10k cycle warranty)
90% DoD
(5k cycle warranty)
100% DoD
(3.5k cycle warranty)
> Limiter Tab
Grid Sell
check this box when exporting solar PV power to the grid
(Net Energy Metering agreement required)
set the numerical value to the maximum number of exporting Watts
Limited Power to Home
check this box when powering both the essential loads sub-panel and
the main house breaker panel using solar and/or battery,
without exporting energy to the grid (limiter sensors required)
Limited power to load
check this box when powering the essential loads sub-panel using solar and/or battery
Time of Use Selling
check this box when discharging the batteries during set times
(either the Grid Sell or Limited Power to Home box must also be checked)
Time
sets the time at which the batteries discharge to power both the essential loads sub-panel
and the main house breaker panel (limiter sensors required)
power (W)
sets the maximum amount of power discharged from the batteries during the set time
do not exceed the Wattage values listed in Tables 2 or 3 above
Batt
the percentage SoC to which the batteries discharge during the set time
20%
10%
0%
Grid Charge
check this box to allow for grid-to-battery charging during the set time
GEN
check this box to allow for gen-to-battery charging during the set time
> Sell Control Tab
80% DoD
90% DoD
100% DoD
General Standard
check this box when a generator is wired to the Grid Input
or to use the Protect Param settings listed in the Grid Input tab
UL 1741 & IEEE 1547
check this box for grid sell compliant functionality (default)
CA Rule 21
check this box for compliance with CA Rule 21
UL 1741SA
check this box for compliance with HECO Rule 14H and/or PREPA
GEN connect to Grid input
check this box when a generator is wired to the Grid Input
> Grid Input Tab
Grid Frequency
select 50 Hz or 60 Hz
Grid Type
select 120/240V split phase (North America),
or contact SimpliPhi to special-order 220V single phase or 120/208V 3 phase
REV20210319










