Figure 15.0 – Inverter Charge Rate Display 
This completes the functional test. The internal set points have been pre-programmed for the PHI 
3.8 Battery bank. 
4.6 – AccESS Optional Components/Accessories Installation 
4.6.1 – DC Coupled PV – 4.8 kW 
The AccESS may be DC Coupled with a PV system up to 4.8 kW DC. Please refer to Schneider 
Electric’s MPPT 80 600 installation manual and wiring diagrams for further information. 
4.6.2 – Remote System Monitoring 
Schneider Electric Conext ComBox 
If purchased with the Conext Gateway or ComBox option, please refer to the Conext Gateway or 
ComBox Owner’s Guide from Schneider Electric. 
Network Requirements 
Before making AC and DC connections, route communication cables through the raceways. For 
easier identification, use a different color for each communications cable, or cable tags. 
Connect communications cables to their components after AC and DC connections are made. 
4.6.3 – Automatic Generator Start 
Schneider Electric Conext AGS 
If purchased with the Conext Automatic Generator Start, please refer to the Conext Automatic 
Generator Start Owner’s Guide from Schneider Electric. 
4.6.4 – Battery Monitoring 
Schneider Electric Conext Battery Monitor 
If purchased with the Conext ComBox, the Conext Battery Monitor is included on the exterior 
door. This comes pre-wired and configured, but for more information, see the Conext Battery 