Operator`s manual

Maintenance
Simplicity Australia Page 4.11 Version 1.0
Check the seal inside the doors for damage. If damaged replace
the seal.
When closing the door make
certain that there is nothing likely
to be wedged between the door
seal and the sealing surface.
Further sealing adjustment can be
achieved by adjusting the three
screws when the door is closed.
Metering Unit or Shaft Leaks
If air leaks are detected between any metering unit and bin,
any agitator or metering spool shaft seal, or any metering unit
window it is advised that your Simplicity Australia Dealer be
notified and repairs are carried out by the Dealer’s trained
Technician.
Bin Divider Leaks
The bin dividers are removable and can be fixed in various
configurations in the bins for the purpose of changing the
capacity of individual bins. Refer
Page 3.11
The bin dividers have been positioned and fully sealed in the Air
Seeder by your Simplicity Australia Dealer as to your
requirements. They are secured in the bin by a number of bolts
with nuts and are designed so that they can be removed and
repositioned by the Operator and an assistant to change bin
capacity should the need arise.
The bin dividers must be fully
sealed with silicon
as air leaks
internally between the bins can be
detrimental to the accuracy of the
sowing operation. Refer
Page 5.1
Arrow
A leak in a bin divider can only be detected if there is a concern with
the sowing operation or by a visual check around the outside of each
divider with consideration to the following:
When changing
bin dividers the
sealing surfaces
must be clean
with all previous
sealant removed.
Before refitting
the dividers
generously apply
sealant to all
sealing surfaces
IMPORTANT
CAUTION: Do NOT open bin lids while blower is
operating. Release of bin lids under pressure will cause
unwanted movement of seed and fertilizer which could
result in injury