Operator`s manual
Operation
Simplicity Australia Page 3.26 Version 1.0
Maximum
performance from the
Simplicity Air Seeder
is dependant on the
correct set up of the
seeding kit
Seeding Kit Components and Terminology (con’t)
Secondary Lines
The Secondary Line is either a 44.5mm or 50mm (depending on
the primary divider) internal diameter smooth bore hose that
transfers the air and the metered product from the primary divider
to the secondary head up tube.
Secondary Head Uptube
The Secondary Head Uptube is either 44.5mm 50mm or
63 mm outside diameter tube which transfers the air
and metered product from the secondary line up to the
secondary head.
Secondary Head
The Secondary Head is manufactured from
stainless steel and has either a 44.5mm, 50mm
or 63mm internal diameter inlet depending on
the uptube and can have 4 to 10 outlets per
head. The outlets are 32.5 mm outside diameter
to accommodate the terminal lines. The
Secondary Head is sealed at the top by a
durable rubber cap to avoid seed damage.
The metered product, once transferred to the secondary head, with
the assistance of air volume and gravity flows out through the
outlets to the sowing boots via the terminal lines.
Terminal Lines
The Terminal Line is a 32.5mm internal diameter preferably
smooth bore line that transfers the metered product from the
secondary head outlet to the sowing boot.
Sowing Boot
The Sowing Boot should have an inlet of 31.75mm inside diameter
and maintain that diameter to the product outlet.
Restricting the
product flow at
the sowing boot
by reducing the
inside diameter
at the the outlet
can cause
seeding kit
blockage.
IMPORTANT










