Operator`s manual

3500 VRC Operator’s Manual
75
V5.00.26
October
2006
Revision M
Part No. : AM
-
Updated : 12/10/2006
Prime (Liquid Tank Only)
The “PRIME” function is only applicable on DC or hydraulic drive airseeder bins and allows the
operator to pre-start the product metering unit to avoid missed gaps at start off or to test product
delivery to the sowing boots when stationary. To set the “PRIME” time see step 6.
1. Check bins are “READY”.
2. Press the “PRIME” softkey at the bottom of the screen.
3. Product metering will start immediately to the equivalent of 8km/h working speed and
automatic control will take over when ground speed is detected.
4. If no ground speed is detected within the prime time (5-60 seconds), product metering will
stop.
Note
‘Prime’ can be activated using the pod buttons when stationary. Press the green button for 2
seconds to start. Press the red button to stop.