Operator`s manual

3500 VRC Operator’s Manual
43
V5.00.26
October
2006
Revision M
Part No. : AM
-
Updated : 12/10/2006
6.4 - Units
Units are selected in Step 1 before starting calibration. If the units are changed after calibration, all
stored calibration factors and records will be converted into the new system of units and can be
recovered after reverting to the previous selection.
6.5 Prime (Liquid Tank Only)
The duration in seconds for which the drive will be primed when the “PRIME” softkey is pressed in
the main screen or when the green button on the pod is pressed.
6.5.1 Setting Prime Time
1. Press the softkey pointing at “PRIME” to highlight the prime duration.
2. Use the arrow keys to set the duration.
6.6 - Two Tenths of a Hectare (Liquid Tank Only)
Allows the operator to test bin calibrations by running the desired drive for 2/10
th
of a hectare
while stationery. The operator can then catch product and check that the bin calibration is correct.
See step 3 on how to use the two tenths of hectare test.
The time taken to run the drive for 2/10
th
of a hectare depends on the 2/10
th
of a hectare speed
set. The time taken to complete 2/10
th
of a hectare is equal to 2/10th of a hectare divided by the
implement width and vehicle speed. See below.
Time taken in minutes = (2000m
2
× 0.06) ÷ implement width metres ÷ speed km/hr
6.6.1 - Set 2/10
th
Hectare Speed
1. Press the softkey pointing at “2/10 HA” until the “KM/HR” value is highlighted.
2. Use the arrow keys to enter a speed.