Specifications
Analytical Modules, continued 
Figure 4-9: Thermistor Bead Board (Exploded View) 
Figure 4-10: Proper Alignment of Metal Inserts 
Step    Procedure 
7.    Install the new O-Rings in hole in the Detector Block. 
It is also possible to install the O-Rings on the thermistor board 
instead of in the hole. If installing the O-Rings on the board, be 
careful not to damage the element. 
8.    Install the Board into the Detector Block. When installing the 
board, exercise caution not to damage the exposed elements. 
A5E31405710001  4-33 










