Installation guide

16
Testing
When the DACT is connected to the system, its operations should be tested with the manual
TEST switch (SW1). The manual test ensures that:
The phone line is working.
The DACT has been programmed with a correct phone number.
Communications with the central station work.
When the manual switch is activated, the DACT dials the central station and transmits a "manual
test" event code to the DACR located at the central station. During the dialing process, the green
power/comm LED (LED1) should change from steady on to flashing, indicating that the DACT is
attempting communications with the central station. The green LED should change back from
flashing to the steady on state when communication is established.
When the green LED returns to steady on, return the TEST switch to the OFF position.
Testing