Installation guide
C: Replacing the Power Supply in a Freeway 1300
DC 900-1537B 69
10. Repeat Step 7 through Step 9 to replace the second power supply if necessary.
11. Plug in the power cords at the rear of the cabinet.
12. Power up each power supply by pressing the power switch on.
13. Power up the Freeway by opening the front door, then pressing the power switch
on the front panel on. Startup proceeds automatically as described in the Freeway
User Guide.
14. Close the front access door and tighten the thumbscrews that hold the door in
place.