User's Manual

SDB680 – INSTALLATION GUIDE TNM-I-E-0046
Aug 14 Page 39 CONFIGURATION TIER II – TIER III
23.4.3. The progress of the write operation will be displayed in the ‘Current Message
Progress’ area.
23.4.4. In the Comms History area, after a short delay, confirm that a ‘Completed
Write All Config’ message is displayed.
23.4.5. When the write operation is completed, the success or failure of the operation
for each VAC, Site or Base will be indicated in the Comms History area.
5.4.5 Enable New Tier III Base
24. On system I/O page, in the System Monitor area, carry out the following:
24.1. On the navigation tree, right click on the new Tier III Base that you wish to enable.
Menu options will be displayed.
24.2. From the menu options, select ‘Base Operations’ > ‘Enable Base(s)’. The base
enable warning message will be displayed.
25. On the base enable warning message, select ‘Yes’ to continue.
26. On system I/O page, carry out the following:
26.1. In the System Monitor area, on the navigation tree, confirm that the status notification
that was alongside the relevant base has now disappeared.
26.2. In the Comms History area, after a short delay, confirm that the ‘Completed Enabling
Base’ message is displayed.