User Manual
SGD-SB2025NT-TUM, Part 2
Jan 12 Page 65
SOLAR CHANNELS
6.2.3 Moving a Central NI to a Different Channel
The following procedure is an example of moving the Central NI #1 from Channel #1 to
Channel #2. The process is very much the same as moving a Station NI and is shown below in
Figure 59
.
1. Move the mouse pointer over Central NI #1, click and hold the left mouse button.
2. A square with a
Green
highlight and the number 1 in it will appear under the pointer. Drag
this to the Channel #2 square, which will also gain a
Green
highlight.
3. Release the mouse button.
4. The line linking Central NI #1 to Channel #1 will move across to Channel #2 as shown in
Figure 59
below.
5. The action is complete.
Figure 59. Moving a Central NI between Channels.
6.2.4 Disabling and Re-enabling a NI
If a Station or Central NI is disabled this will cause the relationship between that NI and the
channel to cease and the connecting line to disappear. When the NI is re-enabled, the original
relationship will be restored.
A new Central NI added to the system will normally relate to the corresponding Channel number;
i.e. Central NI #3 will connect to Channel #3, Central NI #4 to Channel #4 as so forth.
The example in
Figure 60
shows the effect of disabling Station NI #4.