Installation Guide
Page 4
Step 2 :
Step 3 :
DO NOT RETURN THIS ITEM TO THE STORE OR CONTACT THE RETAILER.
Please contact our dedicated customer service team at 1-800-737-5267 or email
customerservice@cheyenneproducts.com to request parts or assistance with your
merchandise. Office hours: Monday - Friday from 8:00 AM - 6:00 PM - (Eastern Time Zone)
Attach the metal shelves (G) x3
to the side frames (B+D) using
bolts (1) x6. Only tighten bolts halfway.
Insert upper and lower back frames (E+F) into left
and right side upper frames (C+D) as shown.
Fully tighten all bolts from steps 1 - 3 .
Attach the left side frames (A+C) to the metal shelves (G)
using bolts (1)x6. Leave the bolts very loose.
1 (x6 )
1 (x6)
G
G
G
D
B
D
B
C
F
F
E
A