Installation Guide
Page 2
1
Bolts x16 2) Bolts x6
**ASSEMBLE ON SOFT SURFACES TO PREVENT DAMAGE TO THE PRODUCT FINISH.
**CAREFULLY REMOVE ALL PARTS FROM THE BOX AND MAKE SURE THAT NO PARTS ARE
MISSING ON THE ASSEMBLY INSTRUCTIONS.
Allen wrench x1 4) Levelers x4
3
DO NOT RETURN THIS ITEM TO THE STORE OR CONTACT THE RETAILER.
Please contact our dedicated customer service team at 1-800-737-5267 or email
customerservice@cheyenneproducts.comto request parts or assistance with your
merchandise. Office hours: Moday - Friday from 8:00 AM - 6:00 PM - (Eastern Time Zone)
1/4” x1/2”L 1/4” x1”L
A) BOTTOM SIDE FRAME x1 B) BOTTOM SIDE FRAME x1 C) BOTTOM SUPPORT BAR x1 D) UPPER SUPPORT BAR x1
E) UPPER SIDE FRAME x1 F) UPPER SIDE FRAME x1 G) WOOD TOP x1 H) WOOD SHELF x2
I) BACK FRAME x1
Step 1:
Screw four levelers (4) x4 into the bottom
of side frames (A+B).
A
4
4
4
4
(5) Plastic anchor x2
(6) Long screw x2
NOTE: Phillips head screwdriver required
but not provided.