Instructions / Assembly

Table Of Contents
5
Pencil/marker
Rubber Mallet
5-gallon buckets (for rinsing panels)
Soft Nylon Brush
Extension Cord(s)
Screw gun
T-Bevel/Angle Finder (for peaks only)
Utility Knife
Masonry drill bits
o 1/8” (for pilot hole)
o 5/16” (for counter sink hole)
Staple Gun (for installation of vapor barrier and
flashing)
Hammer and roofing nails for installation of
flashing (if necessary)
Tin snips
Caulk gun
Other tools that may be needed
Ladder(s) and or scaffolding
Electric hand grinder (with OSHA-approved guard and a diamond wheel or masonry abrasive wheel for
grinding)
Masonry Hole Saw (for penetrations)
Impact screwdriver or Hammer drill (for installing over masonry)
Air compressor for blowing out holes and stone dust removal
______________________________________________________________________________
5) OTHER MATERIALS
House wrap
i
Construction Adhesive - Liquid Nails Extreme Heavy-Duty Construction Adhesive
j
- Application Temp:
22120° F -649° C)
10” Aluminum Coil (for flashing)
SAF
k
- GCP Vycor Pro 9 in. Self-adhered Flashing Tape (Apply: >=25
o
F, Service: -40
o
- 176
o
F)
- 3M All Weather 9 in Flashing Tape
k
(Apply: 0
o
- 176
o
F, Service: -40
o
- 240
o
F)
Drip Cap/Head Flashing (for almost all horizontal transitions)
Composite Shims
Exterior Grade Sanded Caulk (color matched)
Waterproof Exterior Sealant - Dap 18275 DYNAFLEX 920 Premium Elastomeric Interior and Exterior
Sealant
______________________________________________________________________________
6) PREPARING FOR INSTALLATION:
Exterior Application
Remove old siding material (for renovations). If removing siding prior to installing Silvermine, remove any
old fasteners that may create uneven conditions on the wall. Some applications require the removal of the
frieze board and/or soffit to allow for proper installation.
Studs must be 16” or less on center
l
. Locate and mark the studs on the house wrap.
i
A second layer of WRB is NOT needed - CHECK LOCAL BUILDING CODES as codes may state one is required regardless.
j
Recommended for all weather conditions
k
Self-adhered flashing
l
If your building has framing more than 16”, consult your architect or engineer.