Instructions / Assembly
Step 2 MOUNTING THE FRAME
A. Set assembled pillar frame in place with the 2x4 base blocks on the bottom
B. Use Level
(not included) to ensure frame is plumb - Shim if necessary
C. Attach mounting blocks to your base with appropriate mounting hardware
(not
included)
(See local building codes)
D. Attached short, front panel to pillar frame using stainless steel screws to fully
enclose it
Mounting Hardware for Pillar
Frame Base
(not included)
See Local Building Codes
Step 2 STEP-BY-STEP
Frame Panel
4.2
4.2
2x4 Base Blocks
Level
(not included)
Step 2 - D
4.2
VOILA!
NEEDED ITEMS FOR THIS STEP
Stainless Steel Screws
5
Drill
(not included)