User's Manual

16
© 2010 Silver Spring Networks | Company Confidential
Attach IMU Assembly to Meter
Hold the enclosure against the meter to
maintain proper alignment to perform
the following checks:
If no gas is flowing through the meter,
verify that the half cubic ft test hand
rotates approximately 180 degrees when
turned gently by hand
If gas is flowing through the meter, you
should see the test hands rotating. You
do not need to manually rotate the test
hand.
Verify that:
There are no clicking or snapping
sounds
There is no gap between the meter and
IMU
The rear gasket seals the meter to the
IMU
Half foot test hand
Two foot test hand