Installation Instructions

Chapter 3_____________________________________________
Installation and Initialization
Introduction
This section includes a set of detailed procedures for installation, configuration, and testing.
CAUTION
Read and study the following safety information before you
proceed with installation. In addition, cautions and warnings
appear within procedures and throughout the test, where
appropriate, to remind you of any related safety information.
Safety Information
Observe the following safety guidelines. Careful planning of every job is essential. Nothing
should be taken for granted. Do not take chances!
Read and follow all approved policies and procedures provided by your employer associated
with the procedures in this manual.
Keep the work area clean and dry. Cluttered work areas cause accidents and injuries.
Provide good lighting in the work area. You cannot work safely if you cannot see what you
are doing.
Report unsafe conditions or defective equipment to your immediate supervisor.
Select the right tool for the job. Use tools properly. Keep tools in good working order.
Handle materials carefully. Lift and carry properly.
Keep unauthorized people out of the work area. Be especially cautious of children, who tend
to be drawn to work activity.
Innovatec Communications LLC assumes no liability for the customer’s failure to follow
these safety guidelines.
Equipment Needs
This section lists, and briefly describes, the various pieces of equipment required for C&I Gas
Meter Interface end-point device installation, initialization, and testing processes.
Laptop computer-Runs the FSA software, which stores and retrieves work order information,
and configures and tests installed C&I Gas Meter Interfaces.
Field Service Unit-900 MHz two-way radio frequency (RF) transceiver, allowing
communication with an IMU for initialization.’
Before Installation