Instruction Manual

page
IS-TM11
6/9/2022 6 www.ledalite.com
!
ATTENTION: Install in accordance with local and national building and electric codes.
Large Joiner Aligners
Small Joiner
Aligners
Module 2
Module 1
Bring module 1 and 2 together. Engage joiner aligners in
module 2 with housing of module 1.
12
Fixture Joining
13
Fixture Joining
Ensure all connections are secure and all wires are neatly
tucked inside fixture wiring cavity. Slide fixture modules
together gently.
#10-32 Screw
#10-32 Nut
Secure fixture modules together using
the two #10-32 machine screws and
the two #10-32 nuts supplied. Tighten
until joint seam is tight.
Note: Do not overtighten.
14
Fixture Joining
15
Fixture Installation
Raise the row of modules to ceiling
simultaneously. Tighten join again if
required. Now the whole row is
secured. Push excess aircraft cable
through the opening.
IMPORTANT: Do not trim aircraft cable.
For surface mounted junction box,
connect conduit and required
connectors (by others) to drilled
endcap. Refer to 9a & 9b.
16
Surface power feed
Surface Mount Installation Instructions