Installation guide

Modifications reserved Page 60/82
OPM_SGS_USM_M10_M15_0US_V030.doc Operating Manual SG Series 100 120 - 150 kVA
3. Disconnect the Battery, in case of External Battery, from all Units.
Wait 5 minutes for DC-Link Capacitors discharge.
First operated unit All other units of the system
4. Disconnect the Utility supply from all Units.
All LED’s are OFF.
First operated unit All other units of the system
END OF PROCEDURE