Installation guide

Modifications reserved Page 50/82
OPM_SGS_USM_M10_M15_0US_V030.doc Operating Manual SG Series 100 120 - 150 kVA
7.2.3 Restore to normal operation after “total off”
View of the panel after pressing the button
total off”.
All Contacts are open.
Rectifier, Inverter and Static-Switch
shutdown.
1. Reset total off by pressing and holding
the “total offbutton and the inverter
on ( I ) key simultaneously until the
Rectifier starts.
2. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case of
External Battery.
3. Press inverter on ( I ) key.
Soft-start of Inverter indicated with
blinking LED.
At the end of Soft-start the LED
remains lit.
UPS output LED indicates Load on
Inverter.
The LCD must display on the main screen the status “LOAD ON INVERTER”.
END OF PROCEDURE