7.1.5 Restore to normal operation after “total off”
View of the panel after pressing the button
total off”.
All Contacts are open.
Rectifier, Inverter and Static-Switch
shutdown.
1. Reset “total off” by pressing and holding
the “total off” button and then the
“inverter on” ( I ) key simultaneously
until Load is supplied from Bypass and
the Rectifier starts.
Output connects to Bypass Utility.
Rectifier starts with blinking LED.
At the end of Soft-start the LED
remains lit.
The LCD screen shows: “LOAD ON BYPASS”.
Press mute, to reset alarm and buzzer.
2. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case of
External Battery.
3. Press inverter on ( I ) key.
Soft-start of Inverter indicated with
blinking LED.
At the end of Soft-start the LED
remains lit.
Automatic transfer from Bypass to
Inverter.
UPS output LED indicates Load on
Inverter.
The LCD must display on the main screen the status “LOAD ON INVERTER”.
END OF PROCEDURE