Installation guide

Modifications reserved Page 45/82
OPM_SGS_USM_M10_M15_0US_V030.doc Operating Manual SG Series 100 120 - 150 kVA
7.1.4 Complete UPS shutdown (No Load supply)
NOTE !
The Load must be disconnected.
Initial status:
Load supplied from Inverter.
1. Press total off button.
Load is disconnected from UPS.
Rectifier is shut down and all output and
input contactors will be opened.
LED’s, Rectifier, Inverter and Load are OFF.
2. Open Q1 (Pos. O).
LED service check lights up.
3. Disconnect the Battery from the UPS in case
of External Battery.
Wait 5 minutes for DC-Link Capacitors
discharge.
4. Disconnect the Utility.
All LED’s are OFF.
END OF PROCEDURE