Installation Sheet

2
HENLEY
CAST IRON PEDESTAL TUB
SKU: 907547, 414692
INSTALLATION
1. Set the tub in the desired installation location and



2. Move the tub away from the installation location so

pipe at the appropriate height for the waste and



3. Carefully set the tub back into position and adjust
the leveling feet as necessary. If your tub does not
have leveling feet, shims may be used. Once level,
apply a generous bead of silicone on the bottom of
the feet. This will prevent the tub from shifting after
installation.

pipes to the appropriate sizes. Steps 5-8 will walk you
through.


assemblies to the tub.