Installation Sheet
4Cast Iron Tub Installation and Care Guide
5. Apply thread sealant or plumber’s tape to the threads
at each end of all pipes prior to installation. If two pipes
arrive attached, be sure to take them apart and apply
sealant before installing.
6. Connect the tub shoe assembly (A) and rubber washer
to the tub drain (B).
7. Install the overow assembly (C) with the beveled
washer, overow plate, mounting screw (provided) and
any other washers or rubber sealing gaskets included.
8. Attach the waste and overow tee (D) to the overow
assembly (C) and shoe assembly (A) with sealing
washers and slip nuts.
9. Attach the drain tube and ange (E) to the waste and
overow tee (D) with the sealing washer and slip nut.
10. When your tub is in place and all connections have
been made, ll the tub with water to check for any
leaks from the connections and verify that the drain is
working properly.
A
C
D
E
B
Press and Seal Swivel Drain
Press and Seal Swivel Drain
11. Finish your installation by running a bead of silicone
adhesive around the base of the tub. Wipe away any
excess sealant with a damp cloth.
TRIMMING DRAIN PIPES
1. To trim the drain shoe and overow pipes appropriately,
connect the overow and drain assemblies and pipes to
the tub.
2. The overow tee (A) will be attached at the points where
the drain pipes intersect (B).
3. Measure and mark each pipe should so that the end of
the pipe reaches a little over halfway into the overow
tee (A).
4. Trim the pipes at the marked locations with a hacksaw.
Make sure that the blade is suitable for cutting metal
B
A