Installation Sheet

8
10. If included, install the decorative cover plate for
the overflow. Set the cover plate over the opening,
then tighten the two set screws located on the
bottom of the plate. The set screws can be
independently adjusted in order to achieve the desired
11. Fill the tub with water to check for any leaks from
the connections. Verify that the drain is working
properly.
Floor flange
Top of trap adapter
Tile
Substrate
9. Center the tub directly over the tailpiece rough-in.
Install nylon washer onto tailpiece flange, butting the
flat side of the washer up to the tub drain threads.
Apply a small amount of silicone to the tub drain
threads to act as a sealant. With nylon washer
installed, thread the tailpiece lock nut by hand onto
tub drain threads. Use adjustable wrench to finish
tightening firmly.
Tip: You may unscrew the pop-up mechanism and
drain cover to get a better view of the tailpiece
rough-in, above floor level.
8. Finish floor installation.
ACRYLIC TUB WITH INTEGRAL DRAIN
INSTALLATION INSTRUCTIONS