Installation Sheet
TUB WALL INSTALLATION
ALLISTER/PASAIA TUB FAUCET INSTALLATION
10. Once installation is complete, turn the faucet on
for appoximately 60 seconds to check for any leaks,
and to ensure that hot and cold water are running
appropriately. Divert water flow to the hand shower
for testing as well.
9. To complete the installation. connect the water
supply lines (not included) to the faucet’s inlets.
4Allister/Pasaia Tub Faucet Installation Instructions
2. Insert the faucet into the wall of the tub in its
prepared mounting holes. From behind, thread the
lock nuts onto the threaded shanks to secure the
faucet to the tub.
1. Remove the nuts, rubber washers, and lock nuts
from each of the faucet’s threaded shanks.
60 sec
Cold Water Line
Hot Water Line
Lock Nut
Rubber Washer
Nut
Tub Wall






