Installation Sheet
BARNEY WIDESPREAD FAUCET INSTALLATION
11. Attach the faucet handles to the valve stems, as 
shown.
12. Connect the main water supply lines to the valve 
stems. Apply plumber’s tape or thread sealant to the 
threads before tightening. Proceed to drain installa-
tion. Once completed, turn the faucet on and allow 
the water to flow for approximately 60 seconds. 
Ensure that there are no leaks, and that both hot and 
cold water are running properly. 
9. Repeat steps 6-8 to install the ‘hot’ valve stem into 
the left-side faucet hole.
10. Use the provided braided water lines to connect 
the hot and cold valve stems to the T-connector. Use 
an adjustable wrench to tighten, but be careful not to 
overtighten. Apply thread sealant or plumber’s tape to 
each threaded connection before attaching.
4Barney Widespread Faucet Installation Instructions








