Installation Sheet
4
STEP 2: TUB INSTALLATION
1. Set the tub in the desired installation location and 
drop a plumb line from the center of the overflow hole 
to the floor. This will determine your drain location. 
Mark the drain hole location on the floor.
2. Move the tub away from the installation location so 
that the floor plumbing can be installed. Place the drain 
pipe at the appropriate height for the waste and 
overflow piping. To determine this, you will need to 
temporarily fit your drain pipe into the tub and measure 
from the floor to the center of the drain pipe.
3. Carefully set the tub back into position and adjust 
the feet adjusters as necessary. Once level, apply a 
generous bead of silicone on the bottom of the feet. 
This will prevent the tub from shifting after installation. 
4. Next you will need to trim your drain and overflow 
pipes to the appropriate sizes. Steps 5-8 will walk you 
through.
5. To trim the drain and overflow pipes appropriately, 
you will need to temporarily fit the overflow and drain 
assemblies to the tub.
CAST IRON CLAWFOOT TUB
Cast Iron Clawfoot Tub Installation Instructions







