Installation Sheet
5. Connect the main water supply lines to the faucet. 
Apply plumber’s tape or thread sealant to the threads 
before tightening. Use an adjustable wrench to tighten, 
but be careful not to overtighten. Ensure that you are 
connecting the hot and cold lines appropriately. 
8” BRIDGE BATHROOM FAUCET INSTALLATION
7. Proceed to the drain installation. Once completed, 
remove the aerator from the spout and turn the faucet 
on for approximately 60 seconds to remove any dust or 
loose sediment from the water lines. Ensure that there 
are no leaks, and that both hot and cold water are 
running properly. Turn the water off and reattach the 
aerator.
6. Once installation is complete, turn the main water 
supply back on from underneath your sink. Check for 
any leaks underneath.
38” Bridge Bathroom Faucet Installation Instructions
ON
hot
cold
1 min






