Installation Sheet

6
RESIN TUB WITH INTEGRAL DRAIN
INSTALLATION INSTRUCTIONS
9. Fill the tub with water to check for any leaks from
the connections. Verify that the drain is working
properly.
10. Finish your installation by running a bead of neutral
cure silicone sealant around the base of the tub where
it meets the floor. Wipe away any excess sealant with a
damp cloth.
INSTALLATION
WITH QUICK CONNECT DRAIN
1. Drill a 4” diameter hole in the sub floor where the
drain will be installed.
2. Measure the distance from the inside of the p-trap
to the top of the sub floor (p-trap not included).
2 3 4 5 6 7 8 9