System information
SIGNAMAX a.s.
Seat: Palackeho trida 38, 612 00 Brno, CZ l Office: Vlarska 22, P. O. Box 214, 658 14 Brno, CZ
T:+420 533 338 854 l F:+420 533 338 883 l www.signamax.eu
10
straight-through and crossed-over can be used. It means you do not have to tell from
them, just plug it.
⇒ Use Cat. 5 grade RJ-45 TP cable to connect to a TP port of the switch and the other end
is connected to a network-aware device such as a workstation or a server.
⇒ Repeat the above steps, as needed, for each RJ-45 port to be connected to a Gigabit
10/100/1000 TP device.
Now, you can start having the switch in operation.
•
Power On
The switch supports 100-240 VAC, 50-60 Hz power supply. The power supply will
automatically convert the local AC power source to DC power. It does not matter whether any
connection plugged into the switch or not when power on, even modules as well. After the
power is on, all LED indicators will light up immediately and then all off except the power LED
still keeps on. This represents a reset of the system.
• Firmware Loading
After resetting, the bootloader will load the firmware into the memory. It will take about
30 seconds, after that, the switch will flash all the LED once and automatically performs self-
test and is in ready state.