Specifications

Smeal Pumper Demo # 4276
Page 44 of 58
assembly process shall prevent the air bottle from making contact with the stainless steel frame while
loading and unloading the air bottle. The door shall have a brushed stainless steel finish.
FUEL FILL
The fuel fill pocket shall be located in the left rear wheel well area. The fuel fill shall utilize a stainless
steel Fire Shopp door with a brushed finish. The hinge and frame shall all be constructed out of stainless
steel material.
RIGHT SIDE REAR WHEEL WELL POSITION - WR1
There shall be a single air bottle compartment installed in the rear wheel well area. The compartment
door, hinges and frame shall all be constructed out of stainless steel material. The door shall have a
rubber gasket in order to create a 100% seal to protect the interior of the compartment. The storage
compartment shall be a rotational, molded component that is assembled to the door and frame. This
assembly process shall prevent the air bottle from making contact with the stainless steel frame while
loading and unloading the air bottle. The door shall have a brushed stainless steel finish.
RIGHT SIDE REAR WHEEL WELL POSITION - WR3
There shall be a single air bottle compartment installed in the rear wheel well area. The compartment
door, hinges and frame shall all be constructed out of stainless steel material. The door shall have a
rubber gasket in order to create a 100% seal to protect the interior of the compartment. The storage
compartment shall be a rotational, molded component that is assembled to the door and frame. This
assembly process shall prevent the air bottle from making contact with the stainless steel frame while
loading and unloading the air bottle. The door shall have a brushed stainless steel finish.
BODY RUB RAILS
Rub rails shall be installed beneath the compartment doors to protect them from damage should the body
be brushed or rubbed against another object. The rub rails shall be 3/16” aluminum channel, 2-1/2” x 1”.
The rub rails shall be highly polished and then bright dip anodized.
The rub rails shall be installed on the body utilizing non-corrosive nylon spacers and secured with
stainless steel bolts. The outside edge of the rub rails shall be even with the fenderettes and bolt-on steps
to prevent snagging.
REAR TOW HOOK
One (1) rear tow hook shall be installed directly below the rear of the chassis frame rails. The tow hook
shall be capable of a 15,000 lb. straight pull rating.
HOSE BED
The hose bed shall be located above the water tank and have a minimum capacity of 55 cubic feet. The
inside of the hose bed shall be smooth aluminum. The hose bed shall exit at the rear of the apparatus
through a single access opening. The opening shall be free of obstructions that might interfere with the
deployment and loading of hose.