Specifications

Smeal Pumper Demo # 4276
Page 32 of 58
Class "A" foam shall be utilized.
ALUMINUM PUMP MODULE CONSTRUCTION
The pump module shall be fabricated from 1/8" 5052-H32, smooth aluminum sheet. The pump module
shall be fabricated utilizing the break and bend technique in order to form a strong, yet flexible, structure.
The pump module shall be constructed with holding fixtures to ensure proper dimensioning.
INDEPENDENT PUMP MODULE
The pump module shall be fabricated as individual unit independent from the body. The pump module
shall be fabricated using precision holding fixtures to ensure proper dimensions. All attachment points
shall be heavily reinforced.
TREAD PLATE DUNNAGE COMPARTMENT
There shall be a dunnage compartment located above the pump module. The dunnage compartment floor
shall be constructed of tread plate.
PUMP MODULE LIGHTS
There shall be two (2) Truck-Lite model 9185-40003 incandescent lights installed in the pump module.
The lights shall be activated by an automatic switch in the right side pump module access door and shall
be located in a manner that will provide maximum lighting.
CONTROL PANEL
The left side of the pump enclosure shall be divided into two sections. The lower section shall be where
all valve controls, the primer control, the discharge relief valve controls (pilot valve), and other mechanical
controls are located. This surface shall be referred to as the "control panel".
All valve controls shall be the self-locking type, activated by either direct control or with a direct linkage
utilizing friction locking bell cranks and universal ball swivels. The primary valve handles shall have color
coded tags installed in a recessed area to clearly denote the purpose of each control.
INSTRUMENT PANEL
The surface above the control panel shall contain all instruments, gauges, test fittings, and optional
controls. This surface shall be referred to as the "instrument panel". The instrument panel shall be
independent and hinged and latched so that it may be opened. All instruments, gauges, and other
equipment shall be installed with sufficient slack in any cabling, tubing, or plumbing to allow the panel to
swivel to the fully open position.
The instrument and gauge panel shall be vertically hinged "swing out" to provide access for service.
RIGHT SIDE PUMP PANEL
A single panel shall be installed on the right side of the pump enclosure. This shall be the area where any
right side discharges, inlets, steamers, and other pump associated equipment are located. This panel
shall be easily removable and held in place with quick release push latches. It shall be fully removable for