Quick Start Guide

SIGLENT Chapter 2 Function and Features
SDL1000X User Manual 40
Figure 2-32 OPPT Test Function
Operating Steps
1. Connect device
Power on instruments and connect the DUT and the channel input
terminals of the electronic load, as shown in Figure 2-2.
2. Set running parameters
Press the Shift + CV key on the front panel , select OPPT then enter
OPPT test operation, as shown in 2-33, 2-34, 2-35.