Specifications

Testing
Rev 6 Mar.13 Proprietary and Confidential - Contents subject to change 77
7. Press Enter twice.
8. Use the down-arrow key to select Save setup as dfl.
9. Select Exit.
UMTS RF transmission path test
Note: This procedure segment is performed in Step 12 of the Production test procedure on
page 74.
Table C-1 contains parameters used in the suggested test procedure that follows.
To test the DUT’s transmitter path:
Note: This procedure
describes steps using the
"Power Meter: Gigatronics
8651A” (with Option 12
and Power Sensor
80701A).
1. Set up the power meter:
a. Make sure the meter has been given sufficient time to warm up, if
necessary, to enable it to take accurate measurements.
b. Zero-calibrate the meter.
c. Enable MAP mode.
2. Prepare the DUT using the following AT commands:
a. AT!ENTERCND=”<password>”(Unlock extended AT command set.)
b. AT!DAFTMACT (Enter test mode.)
c. AT!DASBAND=<bandValue> (Set frequency band.)
· See Ta ble C-1 for appropriate <bandValue> values
Table C-1: Test settings Transmission path
Mode
Test
category
Bands
850 900 1800 1900 2100
WCDMA
Band 22 29 n/a 15
a
a. Either 15 (WCDMA1900A) or 16 (WCDMA1900B) may be used for testing.
9
Channel
b
b. Channel values shown are at the center of the corresponding bands.
4182 2812 n/a 9400 9750
GSM
Band n/a 10 11 12 n/a
Channel
b
n/a 65 697 661 n/a