User guide

WA_DEV_FEX20_UGD_002 Rev 004 March 08, 2011 118
Fastrack Xtend User Guide
Reliability Compliance and
Recommended Standards
16.3.2.6. Handling Resistance Stress Tests
The following tests the Fastrack Xtends resistance to handling malfunctions and damage.
Table 98. Handling Resistance Stress Tests
Designation
Condition
ESD Test
Standard: IEC 1000-4-2
Special conditions:
Contact discharges: 10 positive and 10 negative applied
Voltage: ±2kV, ±4kV, ±6kV
Operating conditions: Powered
Duration: 24 hours
Operational Durability
OD
Standard: N/A
Special Conditions:
SIM Connector:
Cycles: 40
Repetition Rate: 3s per cycle
Objective: Mating and de-mating
System Connector:
Cycles: 40
Repetition Rate: 3s per cycle
Objective: Mating and de-mating
RF Connector:
Cycles: 20
Repetition Rate: 5s per cycle
Objective: Mating and de-mating
Operating conditions: Un-powered
Duration: 24 hours
Free Fall Test
FFT
Standard : IEC 60068-2-32, Test Ed
Special conditions:
Drop: 2 samples for each direction
Equivalent drop height: 1.5m
Number of directions: 6 (±X, ±Y, ±Z)
Number of drops/face: 2
Operating conditions: Un-powered
Duration:24 hours