Instruction manual
IM-50 Rev. A.2 39
Appendix C:
Quick Start Guide
Smart-Trak® 50 Series
INTRODUCTION
Congratulations on your purchase of the
Smart-Trak® 50 Series digital gas mass flow controller designed to
meet the low-cost budgetary requirements of OEM’s while maintaining excellent quality and performance. This
reference guide is not
meant to replace the Instruction Manual included on the CD-ROM in your shipment, but
rather is a great supplement to it that will help you install and operate your instrument and begin to measure or
control mass flow.
SAFETY 1
st
1. Apply power only after reviewing the wiring diagrams on page 2 of this guide or in the Instruction
Manual.
2. Apply gas flow only after checking plumbing connections for leaks.
3. NEVER TEST FOR LEAKS WITH LIQUID LEAK DETECTOR. If liquid seeps into the
electronics or the hidden sensor compartment, the instrument may be damaged. Instead use a
pressure-decay test (if liquid MUST be used at all, limit it to the fittings and keep it off the body of
the instrument).
INSTALLATION
1. Consult the instrument’s Data Label (on the back of the instrument) for ALL proper operating
parameters. If the information on the Data Label does not match your process conditions, contact
your Representative or Sierra Instruments Customer Service at the contact information on the footer
of the sheet.
2. Install a 10 micron in-line filter upstream of your instrument. If the gas contains any moisture,
use an appropriate dryer or desiccant. Particles larger than 10 micron and moisture may damage your
instrument.
3. Mount according to Data Label orientation. Horizontal flow is preferable and factory default
unless the factory calibration was performed specifically for vertical flow upward or downward, as
listed. Orientation is listed on Data Label and on the Calibration Certificate.
4. This instrument is not a loop-powered device! Do NOT apply power to the 4-20 mA / 0-5 VDC
output or setpoint connections.
5. Wire your instrument per the diagramed pin-out on the back of this card and in Chapter 2 of the
Instruction Manual. For convenience of wiring, there are two DB9 connector ports; the unused DB9
is capped off. Apply power to your choice of port and cap unused port. It is recommended you
allow 15 minutes for the instrument to warm up for maximum accuracy.
6.
OPERATION
1. Power the unit. If you are using the Sierra provided power supply, it is recommended you attach the
D-sub connector to the 50 Series before plugging the adapter into the wall. The unit may take longer
to start than normal if otherwise. This will not damage the unit in any way.
2. Our Mass Flow Controllers with a digital setpoint option are shipped with a zero setpoint in the
power-up setpoint box in the software. For safety considerations, it is recommended YOU
confirm this prior to applying gas to the unit.